Sorry for the abstinence of the last 4 weeks, the site has demanded of us all the attention and, above all, a lot of work.
The interior work is completed in the meantime, the tiles are laid and grouted, the plumbing and electrical assembly is finished, the doors installed, laid the parquet and laminate and mounted the stairs. We have left is 4 basement rooms of which we pick 3 for the bad season.
Now just fill in the ceiling lights I have ordered from a fellow electrician and should arrive next Wednesday. Then immediately the assembly and function test.
Telekom has switched us last week the port for DSL and phone number we have not yet but is expected to reach the next days.
The outdoor facilities have been concerned the last few weeks, extreme, the stone wall had to be increased and the area along the house pulled up to the land beginning. So far we have used about 105 tons of natural stone, filled about 350 tons of crushed stone and recycled materials and compressed, shuttered the initial pedestal and 2 tons of concrete in it shed.
Our double garage has been cast delivered last Monday, was a precision job with the constricted space of the giant crane.
have since late last week, we start with the paving work, we hope that this is done to the river in 11 days. It must now be 160 square paving stones (eco-patch) and 40 square meters Magnum plates (1.0 X 0.5 meters) down.
Our kitchen is next week and hopefully not like last week announced until late August. Since we had 2 weeks no kitchen, cooking, washing, etc. would have been nothing.
So, now let me speak again pictures say more than my words: